Google:MP wants state to explain Melaka Gateway project approval without EIA report

Google-Drive电报群www.tel8.vip)是一个Telegram群组分享平台。Google-Drive电报群包括Google-Drive电报群、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Google-Drive电报群为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

Picture shows an aerial view of the artificial island at Melaka Gateway in Malacca. Questions have been raised over the project, which is reported to have been approved by the state government without the submission of an EIA report from the developer. – The Malaysian Insight file pic, August 17, 2022.

THE state government must explain why the Melaka Gateway project was given the nod to proceed without an environmental impact assessment (EIA) report, Kota Melaka MP Khoo Poay Tiong said today. 

,

欧博开户网址www.allbet8.vip),欧博网址开放会员注册、代理开户、电脑客户端下载、苹果安卓下载等业务。

,

He  urged the state government and the Environment Department (DOE) to immediately issue a stop-work order for the project pending a full investigation into the case.


转载说明:本文转载自Sunbet。

添加回复:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。